NEW BULK SUBSTATION AND UNDERGROUND TRANSMISSION LINE

Location Greenwich, Connecticut APT provided environmental due diligence, substation site selection, routing alternatives, strategic planning, environmental, siting, permitting, civil engineering and construction support services throughout the duration of this important electric reliability Project in southwestern Connecticut. The Project required traversing Interstate 95, a Town Park and a navigable waterway. APT identified and evaluated multiple alternates […]

TRANSMISSION LINE STRUCTURE REPLACEMENTS

Location Central Connecticut This project involved the replacement of 248 structures within an approximate 46-mile transmission corridor and required significant access improvements, work pad repairs, demolition of existing transmission structures, upgrades of Optical Ground Wires, and post-construction restoration. APT assisted its client in planning and permitting the project by performing Connecticut and Federal wetland delineations; […]

SUBSTATION UPGRADE PROJECT

Location Eastern Connecticut This Substation Upgrade Project consisted of converting an existing 69-KV substation to 115-KV for improved reliability in the region. The existing substation footprint was expanded 4,800 square feet to accommodate new and replacement distribution and transmission components. The modifications also included the installation of a new retaining wall and temporary mobile transformer, […]

Micro Cloud Technology Buildings

Location Central Connecticut Micro Cloud Technology Buildings APT is working closely with a multi-disciplined development team to convert vacant and underutilized properties into micro cloud technology centers; small, self-contained cloud data centers designed to run locally – on-site, at the edge, or in a branch location – rather than in a massive centralized facility. They […]

Fulfillment Center Warehouse

Location Windsor, Connecticut APT provided due diligence, entitlement and construction phase services on a 3.8 million square foot warehouse in Windsor, Connecticut, New England’s largest facility of its kind, which opened in early May 2023. APT secured approvals from various local, state and federal agencies that were instrumental in avoiding schedule delays for starting construction. APT performed rare plant and animal surveys in response to consultations with […]

The Promenade Shoppes At Evergreen Walk

Location South Windsor, Connecticut APT provided environmental services on multiple development projects associated with The Promenade Shops at Evergreen Walk in South Windsor, Connecticut. APT was responsible for wetland evaluations, impact analyses, local wetland permitting, and comprehensive wetland mitigation planning for new construction projects including Whole Foods, Shake Shack, and the Goddard School. Development of the mitigation plans included invasive plant treatment, removal and design of a detailed […]

Fuel Cell Facilities

Location Various Locations, Connecticut APT provides environmental due diligence, design and regulatory permitting services on behalf of several clients in support of fuel cell development projects in the Connecticut market, where we bring projects through jurisdictional siting processes.  To date, APT has assisted its clients in the successful deployment of numerous fuel cell facilities ranging in capacity from 500 kilowatts to […]

Utility-grade Solar Developments

Location Various Locations, Connecticut APT has provided environmental, permitting, civil engineering, stormwater management design, and construction monitoring services on more than 60 utility-scale electric generating solar facilities in Connecticut totaling over 225 megawatts of power. Beginning with environmental due diligence activities and natural resource investigations, APT has prepared initial concept plans for vetting before advancing to permit- level drawings for […]

Battery Energy Storage System

Location Salem, Connecticut APT designed and permitted this 4.99-megawatt AC battery energy storage system (BESS) facility in eastern Connecticut. The property is developed with a garden center and multiple structures, requiring careful selection of the BESS location and access to avoid conflicts with ongoing commercial nursery operations and to allow for construction, operation and maintenance activities while minimizing environmental impacts. Several alternatives were evaluated for […]

Structural Engineering Prudential Center

Location Boston, Massachusetts APT prepared a structural analysis and rooftop mount modification drawings for a utility company’s equipment modifications atop the 700’± tall Prudential Center building in Boston.  Rooftop mount modifications were required to accommodate an increase in omni-directional antenna elevation to comply with FCC requirements.  APT conducted a structural mapping of the existing steel rooftop mounts, steel rooftop dunnage frame and host support structure. APT’s […]